Projekt:
International Airport, Berlin-Schönefeld
Redevelopment of the existing access and utilities
Project location: Berlin
SMV Services: Project Management
Client: Flughafen Berlin-Schönefeld GmbH
SMV Contact: Dr.-Ing. Rainer Schofer
Project data
Data sheet download
Project description
Due to the extension of the International Airport Berlin-Brandenburg International (BBI) the existing access and utilties infrastructure which are effected by the construction works have to be rearranged from the construction site to a surrounding trace. The relocation has to be carried out in coordination with the utility companies for the new terminal and the central undergrounf, with connection to the long-distance and suburban railway.

Duration
2005 - 2007

Project objectives
The purpose of the measure is the the change of pipelines postions of available continuance pipelines and with it timely construction field prepayment of the too future airport area under backup of the care of the continuance airport. Moreover farsighted action as well as a big measure is necessary in collaboration and communication all in the Prozess of partners. Special value is laid on a planning fully co-ordinated with the more partial projects which allows an economic change of pipeline postions as well as a construction expiry free of collision.


Benefits for the clients
From essential meaning for the principal the observance of the date when changing pipelines completed is under maintenance of the care of the continuance airport. As a result of the to be planned and by bringing measures were to be steered so that also under consideration of unforeseen events the observance of the appointment is to be guaranteed. SMV is responsible compared with the client and relieves, in addition, the principal by direct personal representation on site. SMV performed a regular reporting about the respective project status and prepared from the principal decisions thoroughly.SMV analyzed the interfaces to other external partners and structured the project under the possible specification to finish the building measure economically and successfully in time.